DRET Academy Primary School

  • Education
  • London, UK

DRET Academy will educate some 1700 students from primary through to post-16 education. This school will build on the Olympic legacy and develop a school that can play an integral role in the ongoing regeneration of East London.

Scope Overview

Site preparation and earthworks: Site clearance, removal of hard surfaces and redundant services, reduced-level excavation, disposal of arisings and placement of imported fill in accordance with the ground remediation strategy.

Loop road diversion: Construction of the road and footways, including surfacing, drainage, service ducts, road markings, lighting, signage and street furniture, with additional concrete footings where the road crossed Thames Water mains.

Retaining wall: Removal of the existing wall and installation of a concrete base and precast retaining wall, including excavation, backfilling and the specified Human Health Layer.

Building structure: Construction of pile caps, lift pits and the ground-floor slab, installation of the gas membrane, structural toppings to upper floors and roof, and grouting beneath structural column bases.

Drainage and utilities: Installation of foul and surface water drainage, manholes and connections to existing networks, CCTV inspections, service diversions and a substation base to UK Power Networks requirements.

External works: Formation of finished levels and construction of hard landscaping, including steps, ramps, kerbs and edgings.

Delivery required maintaining access to the Big Breakfast House and keeping the canal towpath open to the public. Works were planned around the existing Thames Water main, with controls on exclusion zones, plant loading and material storage. Material selection and testing were required to support the project's BREEAM credit requirements and comply with the ground remediation strategy.