Scope of Works
Our scope includes the following
- Large-diameter pipework: Installation of approximately 3 km of 900–1,500 mm diameter ductile iron and concrete pipework at depths of around 3 m within the existing floodplain, plus further 450–900 mm diameter ductile iron pipework across the site.
- Underground concrete structures: Reinforced concrete works for five pumping stations and interception chambers, reaching depths of 7.5 m and dimensions of up to 8.5 m × 13 m, including temporary chambers for construction over-pumping.
- TSR and Actiflow structures: Cropping of 436 CFA piles and reinforced concrete construction, including a 41 m × 24 m Tertiary Solids Removal structure with 7 m-high walls, a 12.5 m-high flow distribution chamber and a 10 m-high storm distribution chamber.