National Grid is constructing a new 400kV substation within the industrial area of the Isle of Grain in Kent to support a new interconnector linking the UK and Germany.

Scope of Works

We delivered site preparation, enabling works and temporary infrastructure at Wallend to support site security, access and lifting operations.

  • Site security and access: Installation of 1.2 m and 1.8 m perimeter fencing and temporary vehicle restraint barriers.
  • Earthworks: Vegetation clearance, topsoil excavation to an average depth of 400 mm, and remediation of localised soft spots.
  • Working platforms: Placement and compaction of 6F material to form a stable working platform and crane mat.
  • Temporary structures: Installation of sheet piling for a temporary mast and construction of crane foundations.
  • Utility works: Identification, isolation and removal of HV cables in accordance with statutory requirements.