Scope Overview
We developed and implemented a detailed remediation strategy for the Harringay Rail Project, incorporating a gabion wall solution designed to stabilise the affected railway embankment. Our works included bulk excavation, installation of gabion wall foundations and baskets, backfilling operations, removal of existing sheet piles, and regrading of the earthworks profile.
Through close collaboration with our client and Network Rail, we developed a cost-effective methodology and programme that enabled the safe and efficient delivery of the stabilisation works while protecting the operational railway.